Wet Pour Playground Transformation at a Primary School in Leeds

Get in Touch

A primary school in Leeds approached our team about improving an outdoor play area that had become increasingly worn after years of daily use. The existing surface was showing signs of deterioration, and the school wanted to create a brighter, more welcoming environment for its pupils.

During our initial conversation with the school, the site manager explained that the playground was used throughout the day, from morning break and lunchtime to outdoor learning sessions.

It was important that the replacement flooring could withstand regular foot traffic while providing suitable impact protection around the existing play equipment.

The school also wanted the finished playground to feel more engaging without introducing a design that would be difficult to maintain.

After discussing the available options, we proposed a two-layer wet pour rubber surfacing system, incorporating a shock-absorbing base layer and a coloured EPDM rubber wearing course.

Assessing the Existing Playground

Before starting the installation, we carried out a site assessment to establish the condition of the existing surface and underlying construction.

Several sections of the playground were uneven, while other areas had become worn around the most frequently used equipment.

We also reviewed the existing drainage arrangements, access points and equipment fall heights to help determine the appropriate installation specification.

The school was particularly interested in creating a colourful design that would complement the playground without overwhelming the space.

During our discussions, a member of staff suggested using a combination of blue and green to reflect the school's outdoor learning theme. We developed a simple layout using these colours, with contrasting sections to help define different parts of the play area.

For the impact-attenuating areas, we specified the required wet pour construction with reference to the equipment's critical fall height and the performance evidence for the selected system under BS EN 1177.

Preparing the Area for Installation

The installation was scheduled to take approximately five working days, subject to suitable weather and the condition of the existing base.

Our first task was to secure the working area and organise access so that the school could continue operating safely while the playground was out of use.

We then removed the damaged surfacing and cleared away loose material.

Once the existing surface had been lifted, we inspected the exposed base for defects. Some minor localised repairs were needed before the new rubber flooring could be installed.

We corrected these areas and checked the levels to ensure the finished surface would provide appropriate falls and avoid unnecessary low spots where water could collect.

The preparation stage took approximately two working days.

Installing the Wet Pour Rubber Surface

With the base prepared, our installers began laying the shock-absorbing SBR rubber layer.

This layer is formed using recycled rubber granules mixed with a specialist polyurethane binder. The material is spread and levelled to the specified depth before being allowed to cure.

The required thickness varies according to the selected system and the impact performance needed for the equipment installed.

Once the base layer was ready, we moved on to the decorative EPDM wearing course.

EPDM rubber granules are available in a range of colours, making them suitable for playground designs that incorporate different shapes, patterns and activity zones.

For this project, we used the agreed blue and green colour scheme, carefully forming the boundaries between the two areas to create a clean, consistent finish.

The material was mixed with the appropriate binder, laid to the specified depth and hand-trowelled to produce an even surface.

Particular attention was given to the edges, equipment surrounds and transitions to adjoining surfaces.

A Final Check Before Reopening

The main installation works were completed within five working days.

We then allowed the finished wet pour surface to cure in accordance with the material requirements and prevailing conditions before the playground was reopened.

During our final inspection, we checked the surface finish, joints, edges and general condition of the completed installation.

We also discussed routine maintenance with the school, including removing debris, keeping drainage points clear and inspecting the flooring for signs of damage.

The site manager was particularly pleased with how the new colours had changed the appearance of the playground.

One of the teaching staff commented that the space now looked much more inviting and would be easier to incorporate into outdoor activities.

The Finished Result

The completed playground had a noticeably different appearance from the tired outdoor area we first assessed.

The new wet pour surface introduced a consistent rubber finish, with contrasting colours that helped give the space a more organised and engaging layout.

By selecting an appropriate impact-attenuating system for the relevant equipment areas, the project also addressed an important aspect of playground safety.

For our team, the most rewarding part of the installation was seeing how a relatively straightforward surfacing project could make such a visible difference to a school's outdoor environment.

The school was able to reopen the improved playground following the required curing period and final checks.

Looking for Wet Pour Playground Installation Across the UK?

Our team can help schools, nurseries, councils and community organisations explore wet pour playground installation, resurfacing and repair solutions throughout the UK.

Whether you're replacing a worn rubber surface, planning a completely new play area or considering a colourful playground design, we can discuss suitable specifications, installation requirements and project timescales.

Contact our team today to request a quotation and find out how we can help transform your outdoor play space.