Designing An Inclusive Children's Playground For A Community In Warwickshire
A primary school playground has to work hard. It needs to accommodate energetic play, provide space for different activities and withstand daily use throughout the school year. When a school in Exeter approached us about developing its outdoor play area, the ambition was to create a brighter, more inviting environment that pupils could enjoy during breaktimes and outdoor sessions.
The school was keen to introduce colour into the space rather than settle for a basic, single-colour surface. At the same time, staff wanted a practical flooring system that could be specified around the playground's intended use and would be straightforward to maintain.
Our role was to turn those ideas into a workable installation, balancing the design with the technical requirements of wetpour safety surfacing.
The project began with a conversation about how the school wanted to use the area once the work was finished. The client was looking for a surface that would make the playground feel more welcoming, with contrasting colours helping to break up the available space and give the children different areas to explore.
We talked through the possibilities offered by wetpour rubber, including coloured sections, simple shapes and bespoke patterns. One advantage of this material is that the design can be incorporated directly into the surface, rather than relying entirely on painted markings that may need refreshing separately.
However, we also advised the school not to finalise the design on appearance alone. The positions of play equipment, access routes and the boundaries of the installation all needed to be considered before the layout could be confirmed.
The client was particularly interested in using colour to make the playground feel less like a conventional paved yard. We discussed a design that would introduce visual interest while keeping the layout relatively clear and allowing the available space to remain functional.
Once the broad design direction had been agreed, we could move on to the practical questions of surface preparation, thickness and installation.
Although the finished colour scheme was an important part of the project, the underlying construction needed equal attention.
Wetpour rubber surfacing is commonly installed as a layered system, often incorporating a resilient base layer made from recycled rubber granules and a coloured EPDM wearing course. The rubber granules are combined with a polyurethane binder and laid to the specified thickness, producing a continuous surface without conventional paving joints.
The exact specification depends on the proposed use of the playground and the condition of the substrate. Where children may fall from elevated play equipment, the critical fall height must be considered when selecting the surfacing system.
We explained to the school that BS EN 1177 provides test methods for assessing the impact attenuation of playground surfacing. The appropriate system must be supported by evidence relevant to its intended application, rather than relying on a general assumption that thicker rubber will always provide sufficient protection.
We also considered the existing ground levels and perimeter details. A well-prepared base is essential for achieving an even finish, while suitable edge restraints or adjoining construction help support the new surfacing and create clean transitions.
These checks gave us a clear basis for planning the installation.
With the design and specification established, we arranged the works to limit disruption to the school's normal timetable. The installation area needed to remain out of bounds while preparation and surfacing were underway, so the sequence of work was discussed with the client beforehand.
Our first priority was to prepare the area. Depending on the condition of the existing construction, this can involve removing old surfacing, correcting localised irregularities and ensuring the base is stable and suitable for the proposed wetpour system.
We checked the levels before laying the rubber, as unevenness beneath the surface can affect the finished appearance and may contribute to problems later. The surrounding edges also needed to be ready to receive the new material.
Once the preparation was complete, we began installing the wetpour in accordance with the agreed layout. Coloured sections require careful planning because each part of the design needs to sit in the correct position. The rubber must be mixed thoroughly with the binder, placed consistently and compacted to the specified thickness.
Where contrasting colours meet, neat transitions are particularly important. Rushing this stage can undermine the appearance of an otherwise well-planned design, so we focused on maintaining the intended pattern while achieving a consistent finish across the playground.
Weather was another factor in the programme. Outdoor wetpour installation is sensitive to moisture and temperature, and the work can be affected by unsuitable conditions. We planned around the forecast and the requirements of the selected system to help protect the quality of the finished surface.
For a small to medium-sized primary school playground with a prepared base and a relatively straightforward colour layout, the surfacing works might take approximately two to four working days. If the project involves extensive removal, sub-base reconstruction, complicated patterns or significant changes to levels, the programme can be longer.
The time needed for curing must also be included. The playground cannot be reopened immediately after the final section has been laid; the material needs to cure in accordance with the manufacturer's instructions and the conditions on site.
For the school, agreeing the programme in advance helped make it easier to plan around the temporary closure of the playground. It also meant there was a shared understanding that achieving a good finish was more important than reopening the area before the surface was ready.
Once the installation was complete and the surfacing had cured, the playground had a refreshed appearance, with the chosen colours giving the space a more distinctive character.
The benefit of the design was not simply that it looked brighter. The school now had a continuous rubber surface that could accommodate everyday play, provided the system had been specified appropriately for its intended use and installed over a suitable base.
As with all playground surfacing, the work does not end at handover. Regular inspections are important for identifying damage, loose granules, worn areas and problems around the perimeter. Appropriate cleaning and prompt attention to defects can help preserve the surface, while any required impact performance should be maintained in line with the relevant system requirements.
This Exeter project demonstrates how a carefully planned wetpour installation can combine a colourful design with the practical requirements of a primary school environment.
We help schools, nurseries, councils and other organisations develop new playgrounds and refurbish existing outdoor spaces. From bespoke colour patterns to replacement safety surfacing, we can help establish the requirements, select an appropriate system and plan the installation around the needs of the site.