How a Gloucester Nursery Replaced Its Unsafe Outdoor Play Surface

Get in Touch

When we were contacted about renovating a playground at a community park in Cardiff, the client had one important request: improve the space without taking away the features local families already enjoyed.

The playground had been a popular part of the park for several years. Its climbing equipment, swings and smaller play structures were still regularly used, but the surrounding wet pour rubber surfacing had started to deteriorate.

The original colours had faded, several sections showed signs of wear, and small cracks had developed around some of the equipment foundations.

The park's management team had received feedback from visitors about the tired appearance of the play area and wanted to make improvements before the surface deteriorated further.

Our role was to assess the existing installation, recommend a suitable renovation method and deliver a refreshed playground surface that worked with the established layout.

The First Decision: Repair or Replace?

Our initial inspection revealed that the condition of the existing rubber varied across the playground.

Some sections were still relatively sound, while others had suffered more extensive wear and localised separation.

The client initially asked whether a new coloured layer could be installed directly over the entire existing surface.

We explained that an EPDM wearing course overlay can sometimes be appropriate where the underlying rubber and substrate remain stable, but it is not suitable for every playground.

The existing impact-attenuation performance, available finished levels and condition of the original construction all needed to be considered.

After further assessment, we recommended removing the defective sections and replacing the affected surfacing with a properly specified wet pour system.

This approach would allow us to address the damaged areas beneath the surface rather than simply cover them.

The client agreed that a more thorough renovation was preferable to another short-term repair.

A Colour Scheme Inspired by the Park

One of the more enjoyable parts of the project was discussing the new appearance of the playground.

The park's representative wanted a brighter finish but was concerned about choosing colours that might look out of place within the surrounding green space.

We suggested using a combination of forest green, light blue and a small amount of yellow to introduce contrast.

The green would help the surface sit comfortably within the park, while the blue and yellow sections would create interest around the main play features.

Rather than dividing the playground into rigid geometric shapes, we proposed a flowing design with curved colour transitions.

The client liked the idea because it gave the playground a fresh identity without requiring any changes to the equipment layout.

Once the colours and construction specification were agreed, we scheduled the work for approximately six working days, followed by the required curing period.

Preparing the Playground for Renovation

We began by securing the working area and arranging suitable temporary barriers.

Because the playground was located within an active community park, we coordinated access with the management team to minimise disruption to nearby pathways.

Our installers then removed the damaged rubber surfacing.

This involved cutting out the defective areas and lifting the material carefully around the existing equipment supports.

Once the old rubber had been removed, we inspected the underlying substrate.

Several sections required localised repairs and cleaning before the replacement surface could be installed.

We also checked the perimeter edges and transitions to the surrounding paths.

The preparation stage took approximately two working days.

During this period, the client visited the site and asked why some sections of the original surface had been removed more extensively than others.

We explained that the removal boundaries had been determined by the condition of the existing material and the requirements of the new installation.

Our priority was to ensure the replacement rubber would be installed over a suitable base.

Installing the New Wet Pour System

The next stage involved installing the new impact-attenuating rubber construction.

Where required, our team mixed recycled SBR rubber granules with a specialist polyurethane binder to form the shock-absorbing base layer.

The specified thickness was selected to provide appropriate performance for the relevant equipment fall heights, supported by suitable BS EN 1177 testing.

Once the base layer was ready, we began applying the coloured EPDM wearing course.

The EPDM granules were mixed with binder in controlled batches and hand-trowelled across the prepared areas.

We followed the agreed colour layout, using green as the dominant finish with blue and yellow sections incorporated around the equipment.

The curved boundaries required careful setting out and finishing.

Our installers worked methodically to maintain consistent thickness and neat transitions between the different colours.

The main rubber installation took approximately three working days.

The Final Day and Reopening Arrangements

On the sixth working day, we completed the finishing details and carried out our final installation checks.

We inspected the surface around the equipment supports, reviewed the perimeter edges and checked the completed colour transitions.

The playground remained closed while the polyurethane binder cured.

We explained to the client that the curing period depended on the specific materials and environmental conditions, so reopening would only take place once the manufacturer's requirements had been satisfied.

We also recommended an appropriate playground inspection before the area returned to public use.

During the final walkthrough, the park's representative commented that the new surfacing had made the playground feel considerably more welcoming.

They were particularly pleased that the renovation had retained the existing equipment while giving the space a noticeably different appearance.

A Fresh Start for an Established Play Area

The completed renovation provided the Cardiff community park with a refreshed wet pour playground surface designed around the existing equipment.

The project addressed the damaged rubber flooring, improved the consistency of the finished surface and introduced a new colour scheme that complemented the surrounding park.

The works took approximately six working days on site, followed by the necessary curing and reopening checks.

For our team, the project demonstrated the value of assessing existing playground surfacing carefully before deciding on the most appropriate renovation method.

By concentrating on the areas that required replacement and selecting a suitable wet pour system, we were able to improve the playground without changing the features that made it popular with local families.

Looking to Renovate a Playground?

We help councils, schools, nurseries, parks and community organisations explore wet pour rubber installation, playground resurfacing and safety flooring refurbishment across the UK.

Whether your playground has faded colours, damaged rubber or worn impact-attenuating surfaces, our team can assess the existing condition and discuss suitable repair or replacement options.

Contact us today to request a quotation and find out how we can help give your playground a fresh new look.

Get in Touch

We aim to get back to you in 1 working day.


Skip to

Privacy Information

Social Links